D6.3 Configuration, test of the platform and first evaluation report |
![]() |
![]() |
![]() |
First prototype of the SISOB tool.
Delivery date: month 22. Abstract: This deliverable describes the two main prototypes of the SISOB system released so far and the evaluations conducted with them. The first of these prototypes is the prototype released in March 2013 as first prototype milestone of the SISOB system. As the actual second prototype of the SISOB system has only been released for internal usage, the second prototype described in this deliverable is the actual third prototype. For both prototypes we describe the user interface together with the available analysis functionalities, the configuration of the system, and also briefly the underlying architecture |